铁道标准设计

2005, (05) 43-45

[打印本页] [关闭]
本期目录(Current Issue) | 过刊浏览(Archive) | 高级检索(Advanced Search)

桥渡壅水计算
Computation of Bridge Crossing Choking

李付军,张佰战
Li Fujun; Zhang Baizhan Author’s Address Railway Construction Division of Railway Sci ence Research Institute;

摘要(Abstract):

在总结桥梁壅水的研究成果的基础上,对我国公路设计规范(1992年版)计算桥梁壅水公式的改进形式与现行铁路设计规范公式做了对比分析,提出新的正交桥壅水计算公式,并采用正交桥天然资料进行了验证。
learning from the finding of bridge crossing choking study, and Comparing Bridge choking formulation provided in Highway Design Specification (1992 Edition) with the formulation given in active Railway Design Specification, we propose a new square bridge choking formulation and prove it by natural data of square bridge.

关键词(KeyWords): 桥梁壅水;壅水计算;计算公式
bridge choking;choking computation;computing formulation

Abstract:

Keywords:

基金项目(Foundation):

作者(Authors): 李付军,张佰战
Li Fujun; Zhang Baizhan Author’s Address Railway Construction Division of Railway Sci ence Research Institute;

DOI: 10.13238/j.issn.1004-2954.2005.05.015

文章评论(Comment):

序号(No.) 时间(Time) 反馈人(User) 邮箱(Email) 标题(Title) 内容(Content)
反馈人(User) 邮箱地址(Email)
反馈标题(Title)
反馈内容(Content)
扩展功能
本文信息
服务与反馈
本文关键词相关文章
本文作者相关文章
中国知网
分享